Quzhou Huafu: Refrigerant Storage & Filling in Quzhou, China
Refrigerant storage, filling & supply from Quzhou, China — capacity, products and compliance documents. Quzhou Huafu is the group's storage-and-filling trading entity in Quzhou, Zhejiang. We buy refrigerants from qualified producers, store and fill/repack them on site, and ship them with the compliance documents importers ask for — COA, MSDS and dangerous-goods packing — in text form that search engines and AI assistants can read.
Buyer Guides (Q&A)
- Which Chinese Standard Governs Which Step: Cylinder Filling, Marking, Storage and Road Transport (2026)
The Chinese standards that a refrigerant cylinder actually lives under — filling (GB/T 14193.1-2025, GB/T 34526-2017), cylinder construction (GB/T 5100-2020, GB/T 5099.1-2017), markings (GB/T 7144-2016, GB/T 16804-2011), classification (GB 6944-2025, GB 12268-2025), warehousing (GB 15603-2022) and road transport (GB 13392-2023) — with the status and effective date of each, and the one field to check in each.
- Which Standard Governs Each Step of a Refrigerant Cylinder? — One-Page Map
One table mapping the life of a refrigerant cylinder — shell, valve, valve outlet, fill limit, inspection, transport and storage — to the framework that governs each step.
- What Happens When a Refrigerant Cylinder Is Filled — And the Records That Let a Buyer Trace It (TSG 23 / GB)
A fill is a sequence of go/no-go checks, not a single action — and each check is meant to leave a record behind.
- Moving Refrigerant Cylinders by Road in China: The Document Set That Travels With the Load (JT/T 617 / GB 12268-2025)
Two document sets travel with a road load of refrigerant cylinders — the consignor's and the carrier's. Which party owns which document, and what has to match what.
- Warehouse Discipline for Packaged Refrigerants: Separation Rules, Stacking and the Records That Trace a Cylinder Back to Its Lot (GB 15603)
An auditor judges a refrigerant warehouse on three separate layers — separation, stacking and records. The third is the one most sites cannot show on the day.
- Storing Refrigerant Cylinders: Segregation, Temperature Limits and Full/Empty Rules (IMDG/ADR/49 CFR)
Three independent rules govern cylinder storage — what may sit next to what, the 52 °C / 125 °F storage ceiling, and why an "empty" cylinder is not empty. Answers, tables and a specification template.
- Refrigerant Cylinder Retest & Requalification (DOT/ISO/GB): What the Stamped Date Actually Requires
A cylinder is not a container you keep. It is a pressure vessel with an expiry, and the expiry is stamped on it.
- Receiving a Refrigerant Delivery: Net-Weight Verification and Pre-Unloading Checks (49 CFR/IMDG/CISG)
You cannot count your way to the right quantity in a refrigerant delivery. Two cylinders with the same product can differ in tare weight, so quantity is verified by.
- Refrigerant Cylinder Filling Ratios & Temperature Compensation (DOT/ISO/GB)
Why a cylinder is never filled to 100%, and how the fill limit is actually calculated.
- Refrigerant Cylinder Valve Outlets by Market (CGA/DIN/BS/AS) — Why the Same Gas Has Different Connections
Why the same refrigerant arrives with a different connection in different countries — and what that means for a shipment.
What this site will document
- Storage, filling and repackaging capability — capacity stated in plain text (not just photos)
- Product range with specifications and CAS where applicable
- Quality documents — COA / MSDS published as readable tables
- Certificates and licences — verified, with numbers masked
Site pages
- Storage & filling capability
licensed filling volumes, warehouse facts and licence list
- Certificates & licences
current licences, issuing authorities, validity dates and how buyers can verify them
Storage and filling details, the product list and certificate copies are being prepared from company documents before this site goes live.
Send your specification, quantity and destination port — we reply with supply options, documents and a quotation. tom@hufluor.com